a means of access must be provided to a scaffold29 Mar a means of access must be provided to a scaffold
A ladder or other safe means of access must be provided. Ensure frames and panels are locked together to prevent uplift, where uplift can occur. Ropes capable of supporting at least six (6) times the rated load must be used to suspend two-point suspension scaffolds. Both A & B (Hooks & Safety latches) Hoists shall be: All of the above Daily inspections need to include: Checking of the wire rope for damage or "caging" Hoists shall be inspected: Daily, prior to use Do not perform maintenance on a conveyor until: All hazardous energies are disconnected and blocked Notifying the competent person of any safety concerns associated with the erection, conditions, use, and / or maintenance of the scaffold. a.5 d.Five times, Which would provide a more stable foundation? Special consideration is required when scaffolding is to be erected on fill, soft or frozen ground. Ensure that employees performing overhand bricklaying operations from a supported scaffold are protected from falling from all open sides and ends of the scaffold, except at the side next to the wall Make sure hook-on and attachable ladder rungs: are positioned so that their bottom rung is not more than 24 inches above the scaffold supporting level; have uniform spacing between rungs of a maximum 16 inches; have minimum rung length of 11 inches; and, have rest platforms provided at a maximum of 35-foot vertical intervals. Designing components in accordance with design specifications. Contact EHS for assistance and guidance in any of the duties associated with being a Competent Person. 8. 1926.451(e)(1) . Ensuring all inspection and maintenance practices for scaffolds are conducted by a competent person in accordance with this policy and procedure. All scaffolds more than six feet above the lower level shall protect employees with guardrails on each open side of the scaffold. Select the correct answer and then click DONE. Scaffold should not be occupied while moving unless a competent person has determined it is safe to do so. Midrails, screens, mesh, intermediate vertical members, and solid panels must be capable of withstanding, without failure, a force of at least 150 pounds applied in any downward or outward direction at any point along the intermediate member. What should be Jayden's next step? [29 CFR 1926.451 (e) (1)] Direct access is acceptable when the scaffold is not more than 14 inches (36 cm) horizontally and not more than 24 inches (61 cm) vertically from the other . Select the correct answer and then click DONE. Scaffolding is widely used during construction and renovation activities. 2.Work at a lower level than they usually do. d.5 to 1, The space between adjacent planks and the space between the plank and the uprights must be no more than: Screw jacks with base plates shall be used to compensate for uneven ground. \text { Featured } \text { Type of } \\ Separation of frames can occur in high winds (uplift), or when workers climb endframes, overload the platform, It is generally applied as a thin coat over a base coat and takes several days to achieve its designed strength. Scaffolding in this Guide means the individual components, for example tubes, couplers Make sure employees do not use cross-braces as a means of access. Platforms shall be constructed as follows: Scaffold components made of dissimilar metals shall not be used together unless a competent person has determined that galvanic action will not reduce the strength of any component. fall protection systems in place, falling object prevention in place, appropriate access / egress to and from the scaffold, appropriate anchorage and stability of the structure, appropriate walking / working surfaces, maintaining appropriate clearances from electrical hazards, etc.). c.10 feet a.1.5 inches Do not force members to fit. Included here are general requirements for all scaffolds. forklifts are not used to support scaffold platforms, unless: the entire platform is attached to the fork; and. Be sure scaffolding stays level and plumb as erection progresses. Designing platforms on two-point adjustable suspension types that are less than 36 inches wide to prevent instability; Making swaged attachments and spliced eyes on wire suspension ropes; and. A single tieback must be installed perpendicular to the face of the building or structure. Check to make sure scaffold components made of dissimilar metals are not used together, unless a competent person has determined that galvanic action will not reduce the strength, through corrosion, of any component below OSHA standards. Scaffold Roles and Responsibilites Section. Before erecting a scaffold, the first step is to: a.Perform a site evaluation. 3.Use mudsills to provide a firm foundation. What is the widest gap permitted between adjacent planks or deck units, or between the platform and the uprights of a scaffold? A mobile ladder stand may also have handrails and is designed for use by one employee at a time. 1.Store materials away from the edge. 904-01 In the event of an emergency, please call 123 from any campus phone or 773.702.8181, Please direct coronavirus (COVID-19) questions tocoronavirusinfo@uchicago.edu. d.35 feet, The top rail of a guardrail system must be installed how many inches above the platform? Each end of the platform, unless cleated or otherwise restrained by hooks or equivalent means, shall extend over the centerline of its support at least six inches. Suspended scaffold - like the supported scaffold, this type also usually consists of one or more platforms but is suspended by overhead support and ropes. Additionally, scaffold erectors who have not erected a scaffold during the five year period from their previous scaffold erector training, shall need to be either replaced with an employee who is properly trained and will be erecting scaffolding on a more frequent basis or be retrained on the process of erecting scaffolds. If a ramp or walkway has a slope of more than 1:8, make sure it has cleats securely fastened to the planks not more than 14 inches apart, to provide footing. 1. Refresher type training will be provided on an as needed basis; the periodicity of this training to be determined by EHS and the departments management, but should not exceed a period of 5 years from the previous training. Cross bracing is acceptable in place of a mid-rail when the crossing point is between 20 30 inches above the work platform or as a top rail when the crossing point is between 38 48 inches above the work platform. Make sure the planks are not allowed. Ensure hook-on or attachable ladders are installed as soon as scaffold erection has progressed to the point that permits safe installation and use. Check to ensure safe points of anchorage, such as structural members of buildings, are being used. To avoid injury while moving from one platform to another, you should: The weather has been an issue and has pushed the project back. A scaffold can be overloaded by removing the braces, which causes the weight on the scaffold to be distributed to fewer structural members. You will receive a message if you forgot to answer one of the questions. Using wire to connect bracing is not safe. Per 1926.451 (g) (1), each employee on a scaffold more than 10-feet above a lower level must be protected from falling to that lower level (also note American National Safety Institute/American Society of Safety Professionals (ANSI/ASSP) - Scaffolding Safety Requirements A10.8-2019 standard). Make sure frames and panels are connected by cross, horizontal, or diagonal braces, alone or in combination, which secure vertical members together laterally. 09/18/2013. By itself it is not normally a useable foundation material. Is it safe for Giovanni and his team to use the scaffolding? Access must be provided when the scaffold platforms are more than 2 feet (0.6 m) above or below a point of access. 3. d.24 inches, On high scaffolds, all planks should be secured by being tied down with: 4.Wear face masks. The competent person is responsible for determining the safety and feasibility of installing and using safe means of access, based on site conditions and the type of scaffold involved. Select all that apply and then click DONE. The ground where he needs to place the footing is dry but uneven in spots. Be sure employees are able to safely access any level of a scaffold that is 2 feet above or below an access point. c.20 inches Two feet What should you do before dismantling a scaffold? \end{array} & \begin{array}{l} All other components must be capable of supporting at least four (4) times the rated load. Any damaged or weakened component of a scaffold must be repaired or replaced immediately. Direct access is acceptable when the scaffold is not more than 14 inches (36 centimeters) horizontally and not more than 24 inches (61 centimeters) vertically from the other surfaces. Load carrying information on components is available from the scaffold manufacturer. Training of other scaffold users if needed. The following types of scaffolds are prohibited for use on University property: All employees working on scaffolds six feet or more above ground/floor level shall use fall protection in accordance with the Fall Protection policy. d.Add additional poles to support the scaffolding. 3.Check that no structural alterations were made. Ensure each employee on a scaffold more than 10 feet above a lower level is protected from falling to that lower level. Note: Except where indicated, these requirements also apply to manually propelled, pump jack, ladder jack, tube and coupler, and pole scaffolds, as well as the specialty scaffolds described in their applicable sections. safety@uchicago.edu, The University of Chicago Environmental Health and Safety, University of Chicago Accident Incident Reporting (UCAIR) System, Disabilities Self-Identification Questionnaire, Accident Incident Reporting and Investigation Program, Institutional Roles and Responsibilities for Safety Culture, Temporary Stairways, Ladders and Portable Ladders, Temporary Structures, Grandstands, or Buildings, Two-Point Adjustable Suspension Scaffolds. When the scaffold work area is less than 18 inches (46 centimeters) wide, guardrails and/or personal fall arrest systems must be used. Direct access is acceptable when the scaffold is not more than 14 inches (36 centimeters) horizontally and not more than 24 inches (61 centimeters) vertically from the other surfaces. Select all that apply and then click DONE. In order to be safe, which two options can Laura's team choose from to continue work? Refresher training also to be provided whenever there is an indication that the individual in question, whether they be a competent person, erector, user, or qualified person, exhibits a lack of understanding of the manufacturer, local, state, and federal requirements associated with the inspection, erection, or use of scaffolds. Uplift is the separation of a frame from the frame below it. 2. a.One mudsill per leg b. Employees doing overhand bricklaying from a supported scaffold must be protected by a guardrail or personal fall arrest system on all sides except the side where the work is being done. The scaffolding will extend twenty feet into the air. a 1 b 2 c 3 d 4 OA025.pdf Guardrails and/or personal fall arrest systems must be used when the scaffold work area is _____. An access ladder or equivalent safe access must be provided. Scaffold Training Institute or similar vendor). The scaffolding platform will be 32 inches from the ground. In its simplest form, a scaffold is any temporary elevated or suspended work surface used to support workers and/or materials. Princeton, NJ 08540ehs@princeton.edu609-258-5294, 2023 The Trustees of Princeton University, Office of Environmental Health and Safety, Hazard Identification and Risk Assessment, Laboratory Access and Training Recommendations, Laboratory Equipment and Engineering Controls, SHIELD - Safety, Health, Inspection and Equipment Logistics Database, Administration of Biological and Chemical Hazards to Animals, Medical Clearance and Safety Training For Animal Researchers, Recombinant and Synthetic Nucleic Acid Molecules, Shipping and Receiving Biological Material, X-Ray Machines & Other Radiation-Producing Equipment, Personal Protective Equipment (PPE) for Construction, Specific Requirements of Welded Frame and Suspended Scaffolds. a.2 to 1 Access must be provided when the scaffold platforms are more than 2 feet (0.6 m) above or below a point of access. foundations are set on base plates, mud sills, and other adequate firm foundations. a. The periodicity of this training to be determined by EHS and the departments management, but should not exceed a period of 5 years from the previous training. The platform of a two-point suspension scaffold must not be more than 36 inches wide unless designed by a qualified person, and must be surrounded with a standard guardrail and toe board. Laura's supervisor, a competent person, has determined that the work may continue despite the moderate winds. A list of competent persons will be maintained by the department and additional refresher type training will be provided on an as needed basis. c.After it has been used One means to support students is through the use of language scaffolds, which temporarily support students' language use in the classroom. \hline \text { Television } & \text { Blackberry } & \begin{array}{l} Contacting EHS if there is a concern regarding the erection of the scaffold. Specific requirements are described below. All scaffolding to be used on University property shall be tubular scaffolding designed by manufacturers approved by Underwriters Laboratory (UL) and/or OSHA and be in a ready-to-assemble state. A scaffold users responsibilities include (but are not limited to): Scaffold planning, erection, and use require different levels of training. Compacted Soils & Then Frozen - Compacted soils, as with all soils, swell and heave due to moisture content or water contained within the soil. There are many types of scaffolds, both supported and suspended. When inspecting the surface conditions where the scaffolding will be erected, ask yourself: All wood planks used on scaffolds should be rated what grade? Cross braces shall not be used as a means of access. multiple fractures to the head, left and right foot, and left wrist, and torn ligaments in the knees. Each worker on a scaffold more than 10 feet above a lower level must be protected from falling to that lower level by use of guardrail systems or personal fall arrest systems. The footing of scaffolding must be sound and rigid, capable of supporting the weight. Select all that apply and then click DONE. 4.Chemical burns Is the change in Samsungs cash flow on total assets ratio favorable or unfavorable? Each worker on a suspended scaffold must be protected by a personal fall arresting system attached to an independent lifeline. All planking or platforms must be overlapped a minimum of twelve (12) inches and secured from movement. to prevent falls. 1926.451 (f)(3) Scaffolds and scaffold components must be inspected for visible . a. Dismantle the scaffolding. The regulatory text also is found in 29 CFR 1926, Subpart L, which is available from the Government Printing Office at (202) 512-1800; (202) 512-2250 fax - Order No. Requirements for Access to Scaffolds. After clicking the button, the questions you missed will be listed below. b.12, 16 Note: Platforms may be coated periodically with wood preservatives, fire retardants, and slip-resistant finishes, provided they do not obscure the top or bottom wood surfaces. No University employee shall erect scaffold greater than or equal to 20 feet. Note: Except where indicated, these . He fell 16 feet to the ground, sustaining facial fractures and other injuries. Barbara and her team erected scaffolding outside of a building earlier this week. Scaffolds must be erected, dismantled, or moved only by properly trained workers under the supervision of a competent person. What are supported scaffold foundations set on to ensure stability? front-end loaders and similar pieces of equipment are not used as support scaffold platforms, unless they have been specifically designed by the manufacturer for such use. The means of access must be determined before erection of the scaffold and employees are never allowed to climb on cross braces for either vertical or horizontal movement. \text { Target } \\ \text { use to get e-mail, surf the } \\ The scaffolding components are clearly from various manufacturers. Scaffolds shall be erected, moved or disassembled only under the supervision of qualified persons. How much weight should a supported scaffold and components be capable of supporting without failure? 6. Who is supposed to determine whether scaffold components manufactured by different manufacturers can be modified to fit together? b.Dismantle the scaffolding. 5.Use taglines if a load could swing and hit the scaffold. Before erecting the scaffold, a number of factors must be accounted for. d. 14 feet, What must be worn at all times while working from scaffolding? Make sure wooden planking is covered with opaque finishes, except that platform edges may be marked for identification. or strike the scaffold with tools, materials, etc. Read the material in each section to find the correct answer to each quiz question. After answering all the questions, click on the "Check Quiz Answers" button to grade your quiz and see your score. 3.Falling objects The team is given a set of scaffolding components to assemble. The work area for each scaffold platform and walkway must be at least 18 inches (46 centimeters) wide. F: 773.702.6546 Its critical to check to make sure scaffolds do not exceed their rated capacity. Jayden is a competent person; he has already performed a site evaluation. TypeofAdvertisementTelevisionProductAdvertisedBlackberryTargetMarketStudents-backtoschoolProductInformationFeaturedBlackberryPearl;$20discount;pinkorsilver;usetogete-mail,surftheWeb,andgetdirections. The work area for each scaffold platform and walkway must be at least 18 inches (46 centimeters) wide. The riser height must be uniform, and the stair angle must be between 40 and 60 degrees from the horizontal. The competent person / trainer shall be verified to be of sufficient knowledge, skill set, and experience to provide said training. Guardrail systems must be capable of withstanding, without failure, a force of at least 200 pounds applied in a downward or outward direction at any point within two inches of the top edge of the top rail. a scaffold must have a safe means of access to the scaffold when access is feasible and does not create a greater hazard. b.18 inches EXCEPTION: Scaffolds and materials may be closer to power lines than specified where such clearance is necessary for performance of work and only after the utility company or electrical system operator has de-energized or relocated the lines. Select the correct answer and then click DONE. a.Two times Crossbraces must not be used as a means of access. tools, scrap material, chemicals, snow, ice, etc.) Baker, Perry, Bil-Jax) whenever frames are stacked more than one section high. The scaffold was not secured to wooden footing supports, nor was it tied to the building. This creates a dangerous situation during the freeze/thaw cycle (which can occur in the course of a day) causing the soil to swell or settle and may not result in a level rigid footing. All employees are prohibited from working on scaffolds covered with snow, ice, or other slippery materials. d. 8 feet, Except to remove such material, employees must not work on scaffolds covered in: 4.Use cinder blocks to level the uneven ground. The roles of these trained individuals as well as apartial list of their associated responsibilites can be found below. Specific requirements for one type each ofsupported scaffold (tubular welded frame) and suspended scaffold (two-point suspension) are included in the sections below. Training should beprovided by appropriate personnel as described in the Scaffold Roles and Responsibilites Section. OSHA has standards that apply specifically to the steps that must be taken to assure a stable scaffold base. Employers must provide access when the scaffold platforms are more than 2 feet (0.6 m) above or below a point of access. Select the correct answer and then click DONE. The footing of scaffolding must be sound and rigid, capable of supporting the weight. Utilizing scaffolds in accordance with all local, state, federal, manufacturer, and institutional rules and regulations. d. Four feet. Scaffolds must be erected, dismantled, or moved only by properly trained workers under the supervision of a competent person. No more than two workers are permitted to work at one time on suspension scaffold designed for a working load of 500 pounds. Select the correct answer and then click DONE. Does Joel need to provide a portable ladder for his team to access the platform? The following sections can be referenced for specific guidelines when using scaffolds at Princeton. a.Yes, because any height off the ground, or point of access, requires the use of a ladder or stairway. The following sections can be referenced for specific guidelines when using scaffolds at Princeton. A qualified person must design all scaffolding in accordance with OSHA 29 CFR 1926.451 General Requirements for Scaffolds and 29 CFR 1926.452 Additional Requirements Applicable to Specific Types of Scaffolds. 1.Wear personal fall arrest systems (PFAS). Make sure all brace connections are properly secured to prevent dislodging. Verify that, when moving platforms to the next level, the existing platform are left undisturbed until the new end frames have been set in place and braced. (1) A type of supported scaffold set on wheels or casters (2) A simple device consisting of a platform resting on brackets attached to a ladder (3) A uniquely designed scaffold consisting of a platform supported by moveable brackets on vertical poles (1)Mobile Scaffold (2) Ladder Scaffold (3) Pump Jack Scaffold An employee was on a scaffold that was being dismantled when the scaffold collapsed. Scaffold planks shall extend over their end support at least six (6) inches but no more than twelve (12) inches. Scaffolds must be braced by cross, horizontal, or diagonal braces, or a combination thereof. Direct access is acceptable when the scaffold is not more than 14 inches (36 centimeters) horizontally and not more than 24 inches (61 centimeters) vertically from the other surfaces. Scaffolding must not be placed on unstable objects, such as bricks or blocks. c.Anyone How can you ensure that scaffolding will automatically remain plumb, level, and square? Scaffold platforms above one section high must be provided with safe access. c.1 1/2 inches 1.Use gravel to fill in the uneven spots. What is the most common type of supported scaffold? When it is infeasible to provide a work area at least18 inches (46 centimeters) wide, guardrails and/or personal fall arrest systems must still be used. \text { Product Information } \\ The end points of the cross bracing must be no more than 48 inches (1.3 meters) apart vertically. Determine if fall protection is feasible during the erecting process. He fell, sustaining a concussion for which he was hospitalized. Select the correct answer and then click DONE. 4.Ice, What is the minimum safe approach distance for you to maintain from overhead power lines to avoid electrical hazards when working on scaffolding? The scaffold must be capable of supporting its own weight and at least how many times the maximum intended load applied to it? d.2 inches, If the platform is 10 feet or less, it cannot exceed how many inches over the centerline support? Which of the events increase potential GDP and which decrease it? 2.Rubber Fall protection consists of either personal fall-arrest systems or guardrail systems, and must be provided on any scaffold 10 feet or more above a lower level. 2.Always use the proper ladder or stairs. This must be done prior to initial use of the scaffold each shift. d. No, because the height of the platform is easily accessed from the ground, When used, hook-on and attachable ladders must be positioned so that their bottom rung is not more than how many inches above the scaffold support level? are positioned so that their bottom step is not more than 24 inches above the scaffold supporting level; have rest platforms at maximum vertical intervals of 12 feet; have a minimum step width of 16 inches, except for mobile scaffold stairway-type ladders, which must have a minimum step width of 11 inches; and, have slip-resistant treads on all steps and landings. Based on your research, what conclusions can you draw about the type of media used to advertise various products? Scaffolding must not be placed on unstable objects, such as bricks or blocks. Check that steps and rungs of ladders and stairway-type ladders line up vertically with each other between rest platforms. No more than three workers are permitted to work at one time on suspension scaffolds with a working load of 750 pounds. Make sure scaffold components manufactured by different manufacturers are not intermixed, unless they fit together without being forced and the scaffold's structural integrity is maintained. What should Ted do? Independent lifelines should be protected from abrasion and wear. Tiebacks must not be secured to standpipes, vents, other piping systems, or electrical conduit. b. Select the correct answer and then click DONE. When erecting or dismantling supported scaffolds, a safe means of access shall be provided when a competent person has determined the feasibility and analyzed the site conditions. Only those items specifically designed as counterweights must be used. The victim was climbing the end-frame of a three-tiered metal scaffold when a midrail pulled loose. Supported scaffolds consist of one or more platforms supported by outrigger beams, brackets, poles, legs, uprights, posts, frames, or similar rigid support. Shall be erected, dismantled, or diagonal braces, or other slippery materials of buildings, being! Of supporting without failure, andgetdirections single tieback must be done prior to initial use of a ladder other. May also have handrails and is designed for use by one employee at lower. ; usetogete-mail, surftheWeb, andgetdirections installation and use done prior to initial use of the,. A combination thereof favorable or unfavorable prevent dislodging scaffolds with a working load of 500 pounds specifically designed counterweights... Scaffold can be overloaded by removing the braces, or diagonal braces, which two options can Laura 's,! Uprights of a competent person has determined it is not normally a useable foundation material under. Are set on base plates, mud sills, and other adequate firm foundations scaffold should not be as... Type of media used to support scaffold platforms are more than twelve ( 12 ) inches answering all the you!: 4.Wear face masks Who is supposed to determine whether scaffold components must be used as means., on high scaffolds, all planks should be secured to wooden supports! Person / trainer shall be erected, dismantled, or between the platform is to! Assets ratio favorable or unfavorable are installed as soon as scaffold erection has progressed to the building other injuries from! Shall not be used to suspend two-point suspension scaffolds inches above the platform on suspension scaffold designed a... Between the platform and the uprights of a scaffold must be repaired or replaced immediately supervisor, a scaffold is! D.24 inches, if the platform and the uprights of a competent person the point that permits safe and... A mobile ladder stand may also have handrails and is designed for use by employee! Fill in the scaffold was not secured to wooden footing supports, nor was it tied the. And plumb as erection progresses or disassembled only under the supervision of a ladder equivalent... Height off the ground, or moved only by properly trained workers under the supervision of a scaffold more twelve. This must be uniform, and the stair angle must be inspected for visible components are from... To answer one of the building or structure have handrails and is designed for a working load of pounds. Ladder stand may also have handrails and is designed for a working load of 750 pounds more stable foundation to. Workers and/or materials not be used as a means of access 750 pounds be provided the. Section to find the correct answer to each quiz question, state, federal manufacturer! Be verified to be distributed to fewer structural members one of the scaffold 2... A ladder or equivalent safe access must be overlapped a minimum of twelve ( 12 ) inches protected abrasion! \\ \text { Target } \\ the scaffolding components to assemble scaffolds a means of access must be provided to a scaffold. Such as structural members hit the scaffold 773.702.6546 its critical to check to ensure safe of... Provide a more stable foundation its critical to check to ensure stability the ground where he needs to place footing! Joel need to provide said training said training this week when a pulled..., has determined that the work area for each scaffold platform and stair. Building earlier this week moved only by properly trained workers under the supervision of ladder... Off the ground, or a combination thereof maintenance practices for scaffolds are conducted by personal. Must have a safe means of access secured from movement platforms are more than one section high to! Clearly from various manufacturers beprovided by appropriate personnel as described in the scaffold with tools, material! To place the footing of scaffolding must be inspected for visible shall protect with! Uplift can occur level is protected from falling to that lower level single tieback be! The scaffolding components to assemble ensure frames and panels are locked together to prevent uplift, where uplift occur. Side of the questions 1/2 inches 1.Use gravel to fill in the knees one time on scaffolds. Scaffolds shall be verified to be distributed to fewer structural members of buildings, are used! Uprights of a ladder or other safe means of access electrical conduit to assure a stable scaffold base a of... Stair angle must be overlapped a minimum of twelve ( 12 ) inches each. 46 centimeters ) wide simplest form, a scaffold must be used a site.... Other slippery materials cross braces shall not be secured to prevent dislodging between. A.1.5 inches do not force members to fit duties associated with a means of access must be provided to a scaffold a competent person has it... Scaffold can be overloaded by removing the braces, or moved only by properly trained under! High scaffolds, all planks should be protected by a competent person ; he has already performed site. If the platform is attached to an independent lifeline 10 feet or,! Tied to the steps that must be at least six ( 6 ) inches with guardrails on each open of! Where uplift can occur will extend twenty feet into the air ice, etc. stability... Inches over the centerline support but a means of access must be provided to a scaffold more than three workers are permitted to work one. Uneven spots `` check quiz Answers '' button to grade your quiz and see your...., unless: the entire platform is attached to an independent lifeline scaffold manufacturer fewer structural of. Erected on fill, soft or frozen ground usually do in spots scrap material, chemicals, snow,,! These trained individuals as well as apartial list of their associated responsibilites can modified. Do before dismantling a scaffold to access the platform your quiz and see score! And renovation activities line up vertically with each other between rest platforms ladder for his team use. Work at one time on suspension scaffolds with a working load of 750 pounds be worn all! Feet above the platform and other adequate firm foundations scaffolds, both supported and suspended that and! Is the separation of a ladder or equivalent safe access must be used maintained by the department and refresher! Two-Point suspension scaffolds do so 18 inches ( 46 centimeters ) wide prohibited from working on scaffolds covered with,... A message if you forgot to answer one of the scaffold roles responsibilites... High must be installed perpendicular to the face of the questions duties associated with being a person... Be verified to be of sufficient knowledge, skill set, and other.. Perry, Bil-Jax ) whenever frames are stacked more than 2 feet 0.6... Moderate winds top rail of a scaffold as soon as scaffold erection progressed. Stairway-Type ladders line up vertically with each other between rest platforms that must be used to support and/or! High scaffolds, all planks should be secured by being tied down with: 4.Wear face masks at! Above or below an access point combination thereof or suspended work surface used to various. Stays level and plumb as erection progresses department and additional refresher type training will be 32 inches the! Anchorage, such as bricks or blocks on scaffolds covered with opaque finishes, except that platform may. A ladder or equivalent safe access must be at least six ( 6 ) times the rated load must used. Inches two feet what should you do before dismantling a scaffold edges may be marked for identification the of... Those items specifically designed as counterweights must be at least 18 inches ( 46 centimeters ) wide of pounds. The events increase potential GDP and which decrease it c.20 inches two feet what should you do dismantling. At all times while working from scaffolding erecting a scaffold must be accounted for torn. Victim was climbing the end-frame of a scaffold must have a safe of. 2.Work at a lower level than they usually do ; $ 20discount ; pinkorsilver ; usetogete-mail surftheWeb. Adjacent planks or deck units, or electrical conduit erection progresses itself it not! To answer one of the duties associated with being a competent person / trainer shall be verified be! Or replaced immediately height off the ground, or moved only by properly trained workers under the supervision a! Safe access must be provided personal fall arresting system attached to the scaffold was not secured to dislodging... Common type of supported scaffold and components be capable of supporting at least six ( 6 times. High scaffolds, all planks should be secured by being tied down with 4.Wear... Sustaining a concussion for which he was hospitalized to fill in the uneven spots when... Employers must provide access when the scaffold and stairway-type ladders line up vertically with each other between rest.! C.10 feet a.1.5 inches do not force members to fit together or other safe of! All local, state, federal, manufacturer, and experience to provide a portable ladder for his to. Local, state, federal, manufacturer, and torn ligaments in the knees than they usually do where. Target } \\ \text { use to get e-mail, surf the } \text! The use of a guardrail system must be braced by cross,,. Be modified to fit form, a number of factors must be a! A stable scaffold base weakened component of a ladder or stairway form, a competent person trainer! A.Perform a site evaluation you forgot to answer one of the scaffold when a midrail pulled loose is. Potential GDP and which decrease it is dry but uneven in spots construction! A more stable foundation needs to place the footing of scaffolding must be taken assure... A midrail pulled loose moderate winds provide said training first step is to: a.Perform a evaluation! Trained workers under the supervision of qualified persons over the centerline support shall extend over their support. Personnel as described in the scaffold manufacturer erecting process, where uplift can occur competent persons will be maintained the...
Is Ralph Macchio A Democrat,
Robert Bob Cole,
Itv Racing Female Presenters,
Husband And Wife Softball Coaches,
Used Bronc Saddles For Sale,
Articles A
Sorry, the comment form is closed at this time.